Excavation on Creston Boulevard/Cleal’s Road

Residents of Creston South are advised that as part of the Creston Boulevard Upgrades project, there will be some excavation taking place in the area of Cleal’s Road this afternoon (September 4/25) in preparation for the installation of a catch basis and culvert. As a result, there will be limited access to Cleal’s Road.

The Town apologizes for any inconvenience this may cause and thanks you for your patience as we upgrade our infrastructure.

Last Updated
Recent Articles
0 of 0