No Parking – Canning Bridge Area

Residents are advised that Trident Construction Limited will be operating a crane on the south side of Canning Bridge for the next two weeks. Residents are asked to not park in the Water Street East area from the bridge to the pole located on Water Street East as per the map below.

After the two weeks is completed, the crane will be moved to the north side of Canning Bridge. At that time, residents are asked to not park on the north side from Canning Bridge to the beginning of the road to the proposed Bailey Bridge.

The Town thanks its residents for their cooperation in this matter as we look forward to the completion of the Bailey Bridge.

Last Updated
Recent Articles
0 of 0