Wally Drake’s Trucking Ltd. will be on site at Canning Bridge tomorrow morning (September 18th) to terminate the Town’s old waterline that runs across the bridge.
Motorists are asked not to park near the end of either side of the bridge starting at 8:00 a.m. for an indefinite period. This will facilitate the contractor getting the necessary equipment to the bridge to perform the termination.
Residents should not experience any interruption in water services.
The Town thanks all motorists who park at the bridge for their cooperation.
Last Updated
Recent Articles
0
of
0